Cancer Treatment Center
Shreveport, LA
Client
Overton Brooks VAMC
Size
21,000 SF
Construction Cost
$8,600,000
Construction Date
N/A
Additional Information
This new Cancer Treatment Center was designed to complement the surrounding buildings on the Overton Brooks VA Medical Center campus with matching brick, cast stone, and aluminum window systems. The interior was designed with a balance of aesthetics, durability and timelessness in order to create a welcoming environment for veterans and their families.
The intent of this project was to create a full-service Cancer Treatment Center to serve the Shreveport area by including medical oncology, radiation oncology and hematology services under one roof. The Medical Oncology Department included (14) chemotherapy bays, an isolation room, pharmacy, blood draw, (8) exam rooms and triage. The Radiation Oncology Department included (2) linear accelerators, a computed tomography (CT) simulator, (3) exam rooms, an exam procedure room, dosimetry, and physics lab.
Spur Design issued 100% Construction Documents, but the project was canceled due to budget restraints.
Healthcare | Commercial | Federal | All
MRI Suite Addition
& Backup MRI Cooling
Muskogee, OK
Client
Eastern Oklahoma VAHCS
Jack C. Montgomery VA Medical Center
Size
5,000 SF/250 SF
Construction Cost
$1,900,000/$560,000
Construction Date
2013/2016
Additional Information
This project included the addition of a new two machine MRI suite. The addition was designed to accommodate one 1.5 Tesla machine to be upgraded to a 3 Tesla machine in the future. The second MRI will be a future installation of an open-bore configuration. The site was restricted with a variety of utility relocations and retaining walls. Special consideration was given in regard to functionality and travel path of the machine.
The original scope of this project consisted of placing the MRI suite in the basement of a 5-story hospital tower. After working with VAMC staff, we helped identify their long-term goals and preferences. This investigation led to the relocation of the suite as an adjacent addition to the 5-story hospital tower.
In 2016, Spur designed the expansion of cooling capacity in the MRI Suite. The scope included site investigations, development of construction drawings and specifications, construction period services, and site visits for the renovation of 250 SF of the existing Magnet Resonance Imaging (MRI) space for expansion of existing MRI equipment room and installation of a backup chilled water 10 ton unitary Leibert HVAC unit and replacement of the existing 5 ton DX Leibert unit from downflow to ducted upflow. A new soundproof wall was extended to separate additional mechanical space needed from the MRI Control Room.