Cancer Treatment Center
Shreveport, LA
Client
Overton Brooks VAMC
Size
21,000 SF
Construction Cost
$8,600,000
Construction Date
N/A
Additional Information
This new Cancer Treatment Center was designed to complement the surrounding buildings on the Overton Brooks VA Medical Center campus with matching brick, cast stone, and aluminum window systems. The interior was designed with a balance of aesthetics, durability and timelessness in order to create a welcoming environment for veterans and their families.
The intent of this project was to create a full-service Cancer Treatment Center to serve the Shreveport area by including medical oncology, radiation oncology and hematology services under one roof. The Medical Oncology Department included (14) chemotherapy bays, an isolation room, pharmacy, blood draw, (8) exam rooms and triage. The Radiation Oncology Department included (2) linear accelerators, a computed tomography (CT) simulator, (3) exam rooms, an exam procedure room, dosimetry, and physics lab.
Spur Design issued 100% Construction Documents, but the project was canceled due to budget restraints.
Healthcare | Commercial | Federal | All
Environmental Systems Support Building
Oklahoma City, OK
Client
Mike Monroney Aeronautical Center
Size
18,000 SF
Construction Cost
$3,370,000
Completion Date
2011
Additional Information
The Environmental Systems Support Building project was 2 task orders awarded from an IDIQ contract. Type “A” services were performed and a schematic design and report was generated outlining the corrections that would need to be made to provide the users with maximum efficiency and bring the building up to current codes.
Spur Design then provided Type ’B’ Services, documenting the addition and renovation of the building based on the previously prepared schematic design. The new addition is currently under construction and includes multiple classrooms, a new breakroom, administration offices, and public restrooms. The existing facility was also remodeled to include all new finishes, lighting, and ceiling systems, as well as updated mechanical and electrical systems.